Proceedings of the Institution of Civil Engineers - Structures and Buildings - v. 177, n. 5 (May 2024)
Published: | May 2024 |
---|
Articles in this Issue
Author(s) | Title | Page(s) |
---|---|---|
Gao, Mengqi / Guo, Yuancheng / Hou, Hetao / Wang, Pengying / Wang, Shibo | Assembly process based on supply chain management of prefabricated houses using building information modeling | 1-37 |
Kexin, Zhang / Dachao, Li / Liu, He / Xingwei, Xue / Teng, Fei | Construction Verification of a Cable-Stayed Arch Cooperative Bridge in China | 1-37 |
Taghipour, Masoumeh / Dehestani, Mehdi | Failure contingency assessment of corroded beams based on structural parameters | 1-19 |
Wang, Xinling / Zhao, Yaokang / Qian, Wenwen / Chen, Yongjie / Li, Ke / Zhu, Juntao | Flexural behaviour of ECC slabs reinforced with high-strength stainless steel wire rope | 1-17 |
Bayraktar, Alemdar / Erdiş, Arif / Kurşun, Altok / Taş, Yavuzhan / Akköse, Mehmet | Impact-induced vibration effects on the real dynamic behaviour of cable-stayed bridges | 1-12 |
Sadeghi, Kabir / Nouban, Fatemeh | Multipurpose algorithm to simulate reinforced concrete structures: macro modelling method | 1-13 |