Construction Verification of a Cable-Stayed Arch Cooperative Bridge in China
Autor(en): |
Zhang Kexin
(School of Transportation and Geomatics Engineering, Shenyang Jianzhu University, Shenyang, Liaoning, China)
Li Dachao (School of Transportation and Geomatics Engineering, Shenyang Jianzhu University, Shenyang, Liaoning, China) He Liu (School of Transportation and Geomatics Engineering, Shenyang Jianzhu University, Shenyang, Liaoning, China) Xue Xingwei (School of Transportation and Geomatics Engineering, Shenyang Jianzhu University, Shenyang, Liaoning, China) Fei Teng (School of Transportation and Geomatics Engineering, Shenyang Jianzhu University, Shenyang, Liaoning, China) |
---|---|
Medium: | Fachartikel |
Sprache(n): | Englisch |
Veröffentlicht in: | Proceedings of the Institution of Civil Engineers - Structures and Buildings, Mai 2024, n. 5, v. 177 |
Seite(n): | 1-37 |
DOI: | 10.1680/jstbu.22.00029 |
- Über diese
Datenseite - Reference-ID
10695811 - Veröffentlicht am:
12.12.2022 - Geändert am:
16.05.2024