The challenges involved in concrete works of Marmaray immersed tunnel with service life beyond 100 years
Author(s): |
Ahmet Gokce
Fumio Koyama Masahiko Tsuchiya Turgut Gencoglu |
---|---|
Medium: | journal article |
Language(s): | English |
Published in: | Tunnelling and Underground Space Technology, September 2009, n. 5, v. 24 |
Page(s): | 592-601 |
DOI: | 10.1016/j.tust.2009.01.001 |
Structures and Projects
- About this
data sheet - Reference-ID
10135414 - Published on:
07/12/2018 - Last updated on:
07/12/2018