0
  • DE
  • EN
  • FR
  • International Database and Gallery of Structures

Advertisement

The challenges involved in concrete works of Marmaray immersed tunnel with service life beyond 100 years

This publication lists 29 references to other publication(s):

  • About this
    data sheet
  • Reference-ID
    10135414
  • Published on:
    07/12/2018
  • Last updated on:
    07/12/2018
Structurae cooperates with
International Association for Bridge and Structural Engineering (IABSE)
e-mosty Magazine
e-BrIM Magazine