BIM-based claims management system: A centralized information repository for extension of time claims
Author(s): |
Babar Ali
Hafiz Zahoor Abdur Rehman Nasir Ahsen Maqsoom Rai Waqas Azfar Khan Khwaja Mateen Mazher |
---|---|
Medium: | journal article |
Language(s): | English |
Published in: | Automation in Construction, February 2020, v. 110 |
Page(s): | 102937 |
DOI: | 10.1016/j.autcon.2019.102937 |
- About this
data sheet - Reference-ID
10400337 - Published on:
12/12/2019 - Last updated on:
12/12/2019