0
  • DE
  • EN
  • FR
  • International Database and Gallery of Structures

Advertisement

The following bibliography contains all publications indexed in this database that are linked with this name as either author, editor or any other kind of contributor.

  1. Ali, Babar / Zahoor, Hafiz / Aibinu, Ajibade / Nasir, Abdur Rehman / Tariq, Ali / Imran, Umair / Khan, Rashid Mehmood (2021): BIM aided information and visualization repository for managing construction delay claims. In: Journal of Information Technology in Construction, v. 26 (January 2021).

    https://doi.org/10.36680/j.itcon.2021.054

  2. Zahoor, Hafiz / Khan, Rashid Mehmood / Nawaz, Ahsan / Ayaz, Muhammad / Maqsoom, Ahsen (2021): Project control and forecast assessment of building projects in Pakistan using earned value management. In: Engineering, Construction and Architectural Management, v. 29, n. 2 (May 2021).

    https://doi.org/10.1108/ecam-11-2020-0989

  3. Zahoor, Hafiz / Chan, Albert P. C. / Gao, Ran / Utama, Wahyudi P. (2017): The factors contributing to construction accidents in Pakistan. Their prioritization using the Delphi technique. In: Engineering, Construction and Architectural Management, v. 24, n. 3 (May 2017).

    https://doi.org/10.1108/ecam-01-2016-0027

  4. Utama, Wahyudi P. / Chan, Albert P. C. / Zahoor, Hafiz / Gao, Ran / Jumas, Dwifitra Y. (2019): Making decision toward overseas construction projects. An application based on adaptive neuro fuzzy system. In: Engineering, Construction and Architectural Management, v. 26, n. 2 (March 2019).

    https://doi.org/10.1108/ecam-01-2018-0016

  5. Tayeh, Bassam A. / Al Hallaq, Khalid / Zahoor, Hafiz / Al Faqawi, Abdulla H. (2019): Techniques and benefits of implementing the last planner system in the Gaza Strip construction industry. In: Engineering, Construction and Architectural Management, v. 26, n. 7 (August 2019).

    https://doi.org/10.1108/ecam-01-2018-0039

  6. Zafar, Irfan / Shen, Geoffrey Qiping / Zahoor, Hafiz / Xue, Jin / Ekanayake, E. M. A. C. (2020): Dynamic Stakeholder Salience Mapping Framework for Highway Route Alignment Decisions: China Pakistan Economic Corridor as a Case Study. In: Canadian Journal of Civil Engineering / Revue canadienne de génie civil, v. 47, n. 11 (November 2020).

    https://doi.org/10.1139/cjce-2019-0308

  7. Ali, Babar / Zahoor, Hafiz / Nasir, Abdur Rehman / Maqsoom, Ahsen / Khan, Rai Waqas Azfar / Mazher, Khwaja Mateen (2020): BIM-based claims management system: A centralized information repository for extension of time claims. In: Automation in Construction, v. 110 (February 2020).

    https://doi.org/10.1016/j.autcon.2019.102937

  8. Maqsoom, Ahsen / Wazir, Saifullah Jan / Choudhry, Rafiq M. / Thaheem, Muhammad Jamaluddin / Zahoor, Hafiz (2020): Influence of Perceived Fairness on Contractors’ Potential to Dispute: Moderating Effect of Engineering Ethics. In: Journal of Construction Engineering and Management, v. 146, n. 1 (January 2020).

    https://doi.org/10.1061/(asce)co.1943-7862.0001740

  9. Mazher, Khwaja Mateen / Chan, Albert P. C. / Zahoor, Hafiz / Ameyaw, Ernest Effah / Edwards, David J. / Osei-Kyei, Robert (2019): Modelling capability-based risk allocation in PPPs using fuzzy integral approach. In: Canadian Journal of Civil Engineering / Revue canadienne de génie civil, v. 46, n. 9 (September 2019).

    https://doi.org/10.1139/cjce-2018-0373

  10. Utama, Wahyudi P. / Chan, Albert PC / Zahoor, Hafiz / Gao, Ran / Peli, Martalius (2018): Exploring the Strategic Motivation of Internationalisation: Indonesian Contractors' Perspectives. In: Construction Economics and Building, v. 18, n. 4 (December 2018).

    https://doi.org/10.5130/ajceb.v18i4.5899

  11. Utama, Wahyudi P. / Chan, Albert P. C. / Zahoor, Hafiz / Gao, Ran (2016): Review of research trend in international construction projects: a bibliometric analysis. In: Construction Economics and Building, v. 16, n. 2 (June 2016).

    https://doi.org/10.5130/ajceb.v16i2.4866

  12. Choudhry, Rafiq M. / Zahoor, Hafiz (2016): Strengths and Weaknesses of Safety Practices to Improve Safety Performance in Construction Projects in Pakistan. In: Journal of Professional Issues in Engineering Education and Practice, v. 142, n. 4 (October 2016).

    https://doi.org/10.1061/(asce)ei.1943-5541.0000292

  13. Zahoor, Hafiz / Chan, Albert P. C. / Utama, Wahyudi P. / Gao, Ran / Memon, Shoeb Ahmed (2017): Determinants of Safety Climate for Building Projects: SEM-Based Cross-Validation Study. In: Journal of Construction Engineering and Management, v. 143, n. 6 (June 2017).

    https://doi.org/10.1061/(asce)co.1943-7862.0001298

  14. Gao, Ran / Chan, Albert P. C. / Utama, Wahyudi P. / Zahoor, Hafiz (2017): Workers' Perceptions of Safety Climate in International Construction Projects: Effects of Nationality, Religious Belief, and Employment Mode. In: Journal of Construction Engineering and Management, v. 143, n. 4 (April 2017).

    https://doi.org/10.1061/(asce)co.1943-7862.0001226

  15. Mazher, Khwaja Mateen / Chan, Albert P. C. / Zahoor, Hafiz / Khan, Mohsen Islam / Ameyaw, Ernest Effah (2018): Fuzzy Integral–Based Risk-Assessment Approach for Public–Private Partnership Infrastructure Projects. In: Journal of Construction Engineering and Management, v. 144, n. 12 (December 2018).

    https://doi.org/10.1061/(asce)co.1943-7862.0001573

Search for a publication...

Only available with
My Structurae

Full text
Structurae cooperates with
International Association for Bridge and Structural Engineering (IABSE)
e-mosty Magazine
e-BrIM Magazine