BIM aided information and visualization repository for managing construction delay claims
Author(s): |
Babar Ali
Hafiz Zahoor Ajibade Aibinu Abdur Rehman Nasir Ali Tariq Umair Imran Rashid Mehmood Khan |
---|---|
Medium: | journal article |
Language(s): | English |
Published in: | Journal of Information Technology in Construction, January 2021, v. 26 |
Page(s): | 1023-1040 |
DOI: | 10.36680/j.itcon.2021.054 |
Abstract: |
Delays in construction result in a multitude of negative effects on project performance, and severe dismays among participating parties. This study aims to digitize the traditional process of recording and managing the construction delays using Building Information Modeling (BIM). Extensive literature review followed by semi-structure interviews of 21 industry experts were carried out to identify the issues faced by construction stakeholders in managing construction delays. To resolve these issues, a plugin named BIM-based Construction Delays Recorder (BIM-CDR) is developed using Application Programming Interface (API) of the most commonly used BIM software i.e. Autodesk Revit. BIM-CDR provides a centralized repository, encompassing detailed information related to delays, which can be retrieved and visualized to analyze their impact on delay claims. To assess the effectiveness of BIM-CDR, a feasibility study is conducted with the experts’ review panel. The results revealed that BIM-CDR can record wide-ranging information related to all the significant issues causing delays on construction sites, and can help in effectively managing their corresponding claims. The advantages of the developed prototype include visualization of delays’ location, facilitation of delay analysis and effective delays management. Moreover, it also promotes transparency and speedy settlement of delay related claims without any unwanted disputes. |
- About this
data sheet - Reference-ID
10647490 - Published on:
10/01/2022 - Last updated on:
10/01/2022