0
  • DE
  • EN
  • FR
  • International Database and Gallery of Structures

Advertisement

BIM-based claims management system: A centralized information repository for extension of time claims

This publication lists 96 references to other publication(s):

  • About this
    data sheet
  • Reference-ID
    10400337
  • Published on:
    12/12/2019
  • Last updated on:
    12/12/2019
Structurae cooperates with
International Association for Bridge and Structural Engineering (IABSE)
e-mosty Magazine
e-BrIM Magazine