Application of the maturity model for collaborative scheduling for construction projects
Author(s): |
Natalie M. Scala
Thais da Costa Lago Alves Dominique Hawkins Vincent Schiavone Min Liu |
---|---|
Medium: | journal article |
Language(s): | English |
Published in: | Engineering, Construction and Architectural Management |
DOI: | 10.1108/ecam-03-2023-0236 |
- About this
data sheet - Reference-ID
10805902 - Published on:
10/11/2024 - Last updated on:
10/11/2024