- Application of the maturity model for collaborative scheduling for construction projects. In: Engineering, Construction and Architectural Management. :
- Prioritizing collaborative scheduling practices based on their impact on project performance. In: Construction Management and Economics, v. 40, n. 7-8 (17 July 2022). (2022):
- The gold standard: developing a maturity model to assess collaborative scheduling. In: Engineering, Construction and Architectural Management, v. 30, n. 4 (March 2022). (2022):
- Survey Comparing Critical Path Method, Last Planner System, and Location-Based Techniques. In: Journal of Construction Engineering and Management, v. 145, n. 12 (December 2019). (2019):