0
  • DE
  • EN
  • FR
  • International Database and Gallery of Structures

Advertisement

1일 작업량 미만 공사의 공사비 산정 방식의 개선방안에 관한 연구 (Study on Improvement of Cost Calculation Method in Construction less than One Day Workload)

Structurae cannot make the full text of this publication available at this time. The full text can be accessed through the publisher via the DOI: 10.5345/jkibc.2014.14.5.477.
  • About this
    data sheet
  • Reference-ID
    10761644
  • Published on:
    15/03/2024
  • Last updated on:
    15/03/2024
 
Structurae cooperates with
International Association for Bridge and Structural Engineering (IABSE)
e-mosty Magazine
e-BrIM Magazine