0
  • DE
  • EN
  • FR
  • International Database and Gallery of Structures

Advertisement

1일 작업량 미만 공사의 공사비 산정 방식의 개선방안에 관한 연구 (Study on Improvement of Cost Calculation Method in Construction less than One Day Workload)

This publication has been cited in the following 2 other publication(s):

  • About this
    data sheet
  • Reference-ID
    10761644
  • Published on:
    15/03/2024
  • Last updated on:
    15/03/2024
Structurae cooperates with
International Association for Bridge and Structural Engineering (IABSE)
e-mosty Magazine
e-BrIM Magazine