1일 작업량 미만 공사의 공사비 산정 방식의 개선방안에 관한 연구 (Study on Improvement of Cost Calculation Method in Construction less than One Day Workload)
Auteur(s): |
Dae-Woong Shin
Young-Do Lee Yoonseok Shin Gwang-Hee Kim Sangrok Yoo Wonjun Park |
---|---|
Médium: | article de revue |
Langue(s): | anglais |
Publié dans: | Journal of the Korea Institute of Building Construction (한국건축시공학회지), octobre 2014, n. 5, v. 14 |
Page(s): | 477-485 |
DOI: | 10.5345/jkibc.2014.14.5.477 |
- Informations
sur cette fiche - Reference-ID
10761644 - Publié(e) le:
15.03.2024 - Modifié(e) le:
15.03.2024