Dae-Woong Shin
- 전문건설공사의 발주사례분석을 통한 입찰업무의 개선방안 (Improvements of the Bidding Process through Order Case Analysis of Specialty Construction). Dans: Journal of the Korea Institute of Building Construction (한국건축시공학회지), v. 15, n. 5 (octobre 2015). (2015):
- 계층 분석 방법을 이용한 원자로 격납 건물 시공의 리스크 요인 분석 (Analysis on Risk Factors of Reactor Containment Building Construction using Analytic Hierarchy Process). Dans: Journal of the Korea Institute of Building Construction (한국건축시공학회지), v. 15, n. 4 (août 2015). (2015):
- 1일 작업량 미만 공사의 공사비 산정 방식의 개선방안에 관한 연구 (Study on Improvement of Cost Calculation Method in Construction less than One Day Workload). Dans: Journal of the Korea Institute of Building Construction (한국건축시공학회지), v. 14, n. 5 (octobre 2014). (2014):
- Data Fusion of Real Time Physical Status Monitoring for Building Structure through Mobile Phone. Dans: International Journal of Structural and Civil Engineering Research, v. 4, n. 2 ( 2015). (2015):
- Comparison of Risk Assessment for a Nuclear Power Plant Construction Project Based on Analytic Hierarchy Process and Fuzzy Analytic Hierarchy Process. Dans: Journal of Building Construction and Planning Research, v. 4, n. 3 ( 2016). (2016):