Realization of Sava River Crossing with its Approach Bridges as First Section of Belgrade Inner City Semi-Ring Road
|
Bibliographic Details
Author(s): |
Bratislav Stipanic
Zoran Floric |
||||
---|---|---|---|---|---|
Medium: | conference paper | ||||
Language(s): | English | ||||
Conference: | IABSE Symposium: Engineering for Progress, Nature and People, Madrid, Spain, 3-5 September 2014 | ||||
Published in: | IABSE Symposium Madrid 2014 | ||||
|
|||||
Page(s): | 2148-2154 | ||||
Total no. of pages: | 7 | ||||
Year: | 2014 | ||||
DOI: | 10.2749/222137814814068670 | ||||
Abstract: |
The paper deals with the realization of Sava River Crossing with its approach bridges as first section of Belgrade Inner City Semi-Ring Road (ICSRR). The Sava River Crossing, as the first section of the Project named Belgrade Inner City Semi-Ring Road (ICSSR with overall length of 17,5 km), consists of the main bridge across Sava River and so-called South Approach Roads (SAR) and North Approach Roads (NAR). The Ada Bridge carries 6 lanes of vehicular traffic, 2 rail tracks for LRT (future Belgrade metro BGM) and 2 lanes of pedestrian/cycle-way. The bridge has total length of 967 m and 43500 m² bridge deck area. SAR contains altogether 22 bridges (viaducts and ramps) with overall length of 3350 m and 36700 m² bridge deck area. NAR contains altogether 19 bridges (viaducts and ramps) with overall length of 2830 m and 36300 m² bridge deck area. The new Sava River Crossing with its approach bridges is a major infrastructure project realized in Belgrade last years that significantly effects to the reduction of traffic jams of vehicular traffic in the city. Sava River crossing with its approach bridges was completed for roadway traffic by start 2014. |
||||
Keywords: |
bridge design bridge construction roadway bridges
|