0
  • DE
  • EN
  • FR
  • Internationale Datenbank und Galerie für Ingenieurbauwerke

Anzeige

Realization of Sava River Crossing with its Approach Bridges as First Section of Belgrade Inner City Semi-Ring Road

 Realization of Sava River Crossing with its Approach Bridges as First Section of Belgrade Inner City Semi-Ring Road
Autor(en): ,
Beitrag für IABSE Symposium: Engineering for Progress, Nature and People, Madrid, Spain, 3-5 September 2014, veröffentlicht in , S. 2148-2154
DOI: 10.2749/222137814814068670
Preis: € 25,00 inkl. MwSt. als PDF-Dokument  
ZUM EINKAUFSWAGEN HINZUFÜGEN
Vorschau herunterladen (PDF-Datei) 0.16 MB

The paper deals with the realization of Sava River Crossing with its approach bridges as first section of Belgrade Inner City Semi-Ring Road (ICSRR). The Sava River Crossing, as the first section ...
Weiterlesen

Bibliografische Angaben

Autor(en):

Medium: Tagungsbeitrag
Sprache(n): Englisch
Tagung: IABSE Symposium: Engineering for Progress, Nature and People, Madrid, Spain, 3-5 September 2014
Veröffentlicht in:
Seite(n): 2148-2154 Anzahl der Seiten (im PDF): 7
Seite(n): 2148-2154
Anzahl der Seiten (im PDF): 7
Jahr: 2014
DOI: 10.2749/222137814814068670
Abstrakt:

The paper deals with the realization of Sava River Crossing with its approach bridges as first section of Belgrade Inner City Semi-Ring Road (ICSRR). The Sava River Crossing, as the first section of the Project named Belgrade Inner City Semi-Ring Road (ICSSR with overall length of 17,5 km), consists of the main bridge across Sava River and so-called South Approach Roads (SAR) and North Approach Roads (NAR). The Ada Bridge carries 6 lanes of vehicular traffic, 2 rail tracks for LRT (future Belgrade metro BGM) and 2 lanes of pedestrian/cycle-way. The bridge has total length of 967 m and 43500 m² bridge deck area. SAR contains altogether 22 bridges (viaducts and ramps) with overall length of 3350 m and 36700 m² bridge deck area. NAR contains altogether 19 bridges (viaducts and ramps) with overall length of 2830 m and 36300 m² bridge deck area. The new Sava River Crossing with its approach bridges is a major infrastructure project realized in Belgrade last years that significantly effects to the reduction of traffic jams of vehicular traffic in the city. Sava River crossing with its approach bridges was completed for roadway traffic by start 2014.

Stichwörter:
Brückenentwurf Brückenbau