Zoran Floric
- (2012): Sava Bridge Project – Accelerated Design-Build Realization. Presented at: 18th IABSE Congress: Innovative Infrastructures – Towards Human Urbanism, Seoul, Korea, 19-21 September 2012.
- (2014): Realization of Sava River Crossing with its Approach Bridges as First Section of Belgrade Inner City Semi-Ring Road. Presented at: IABSE Symposium: Engineering for Progress, Nature and People, Madrid, Spain, 3-5 September 2014.
- Design of Footbridge over Danube Bay in Novi Sad (Serbia). Presented at: Footbridge 2014 - Past, Present & Future, London, 16-18 July 2014. (2014):
- Realization of Sava Bridge Project in Belgrade (Serbia). Presented at: 35th Annual Symposium of IABSE / 52nd Annual Symposium of IASS / 6th International Conference on Space Structures: Taller, Longer, Lighter - Meeting growing demand with limited resources, London, United Kingdom, September 2011. (2011):
- (2010): Design Proposal of New Roadway Bridge across the Danube in Novi Sad. Presented at: IABSE Symposium: Large Structures and Infrastructures for Environmentally Constrained and Urbanised Areas, Venice, Italy, 22-24 September 2010.
- (2008): Design & Construction of Ada Bridge across Tissa River in Serbia. Presented at: 17th IABSE Congress: Creating and Renewing Urban Structures – Tall Buildings, Bridges and Infrastructure, Chicago, USA, 17-19 September 2008.