Preliminary Design of a New Crossing of the River Mersey

 Preliminary Design of a New Crossing of the River Mersey
Author(s):
Presented at IABSE Symposium: Large Structures and Infrastructures for Environmentally Constrained and Urbanised Areas, Venice, Italy, 22-24 September 2010, published in , pp. 616-617
DOI: 10.2749/222137810796063049
Price: € 25.00 incl. VAT for PDF document  
ADD TO CART
Download preview file (PDF) 0.04 MB

The Mersey Estuary stretches approximately 35km inland and forms a major obstacle to North- South communications in the North West of England. The existing road bridge at Runcorn Gap opened in 1961...
Read more

Bibliographic Details

Author(s):
Medium: conference paper
Language(s): English
Conference: IABSE Symposium: Large Structures and Infrastructures for Environmentally Constrained and Urbanised Areas, Venice, Italy, 22-24 September 2010
Published in:
Page(s): 616-617 Total no. of pages: 8
Page(s): 616-617
Total no. of pages: 8
Year: 2010
DOI: 10.2749/222137810796063049
Abstract:

The Mersey Estuary stretches approximately 35km inland and forms a major obstacle to North- South communications in the North West of England. The existing road bridge at Runcorn Gap opened in 1961 and was designed for 10,000 vehicles a day - it now carries over 80,000. Gifford were appointed by Halton Borough Council in 2001 to develop proposals for a new crossing.

Various options were considered and compared in terms of traffic flows, economic benefit, environmental impact and objective satisfaction. The preferred option was for a route upstream of the existing bridge connecting the existing highways either side of the river. It crosses the estuary where it is approximately 1km wide. A 4-span cable stayed structure was chosen to reduce the effects on the tidal flows and the environment. The Scheme has been through a Public Inquiry, the results of which are expected during the first half of 2010.

Keywords:
preliminary design route selection environment cable-stayed estuary