0
  • DE
  • EN
  • FR
  • Internationale Datenbank und Galerie für Ingenieurbauwerke

Anzeige

Preliminary Design of a New Crossing of the River Mersey

 Preliminary Design of a New Crossing of the River Mersey
Autor(en):
Beitrag für IABSE Symposium: Large Structures and Infrastructures for Environmentally Constrained and Urbanised Areas, Venice, Italy, 22-24 September 2010, veröffentlicht in , S. 616-617
DOI: 10.2749/222137810796063049
Preis: € 25,00 inkl. MwSt. als PDF-Dokument  
ZUM EINKAUFSWAGEN HINZUFÜGEN
Vorschau herunterladen (PDF-Datei) 0.04 MB

The Mersey Estuary stretches approximately 35km inland and forms a major obstacle to North- South communications in the North West of England. The existing road bridge at Runcorn Gap opened in 1961...
Weiterlesen

Bibliografische Angaben

Autor(en):
Medium: Tagungsbeitrag
Sprache(n): Englisch
Tagung: IABSE Symposium: Large Structures and Infrastructures for Environmentally Constrained and Urbanised Areas, Venice, Italy, 22-24 September 2010
Veröffentlicht in:
Seite(n): 616-617 Anzahl der Seiten (im PDF): 8
Seite(n): 616-617
Anzahl der Seiten (im PDF): 8
Jahr: 2010
DOI: 10.2749/222137810796063049
Abstrakt:

The Mersey Estuary stretches approximately 35km inland and forms a major obstacle to North- South communications in the North West of England. The existing road bridge at Runcorn Gap opened in 1961 and was designed for 10,000 vehicles a day - it now carries over 80,000. Gifford were appointed by Halton Borough Council in 2001 to develop proposals for a new crossing.

Various options were considered and compared in terms of traffic flows, economic benefit, environmental impact and objective satisfaction. The preferred option was for a route upstream of the existing bridge connecting the existing highways either side of the river. It crosses the estuary where it is approximately 1km wide. A 4-span cable stayed structure was chosen to reduce the effects on the tidal flows and the environment. The Scheme has been through a Public Inquiry, the results of which are expected during the first half of 2010.

Stichwörter:
Vorbemessung Trassenauswahl

Bauwerke und Projekte