The " Piccard Bridge" in Obergurgl, Austria
Author(s): (tragwerk statt Ziviltechniker gmbh, Salzburg, Austria)
Medium: conference paper
Language(s): English
Conference: Footbridge 2022: Creating Experience, Madrid, Spain, 07-09 September 2022
Published in:
DOI: 10.24904/footbridge2022.102
Abstract:

The new bridge in the rearmost Ötztal is not a touristic attraction, it is a simple necessity as the existing route over the glacier had become more and more dangerous and complicated to walk. The new bridge with a span of 137.20 m stays at a height of around 82 m over the glacier stream of the Gurgler Ferner. Since its construction in spring 2017, the bridge serves as a new connection between the Ramolhaus and the Langtalereckhütte. The remoteness of the construction site, rapidly changing weather conditions at 2500 m above sea level and the adversity in accessibility due to the valley slopes, which were up to 80° steep, brought along high demands for design and construction of the bridge.

Keywords:
structural concepts stress ribbon bridge detail planning high alpine construction
License:

This creative work is copyrighted. The copyright holder(s) do(es) not grant any usage rights other than viewing and downloading the work for personal use. Further copying or publication requires the permission of the copyright holder(s).

Structures and Projects

Download preview file (PDF)
0.54 MB
  • About this
    data sheet
  • Reference-ID
    10632740
  • Published on:
    07/10/2021
  • Last updated on:
    08/10/2021
 
Structurae cooperates with
International Association for Bridge and Structural Engineering (IABSE)
e-mosty Magazine
e-BrIM Magazine