The "Piccard Bridge" in Obergurgl, Austria
Autor(en): |
Rudolf Brandstötter
(tragwerk statt Ziviltechniker gmbh, Salzburg, Austria)
|
---|---|
Medium: | Tagungsbeitrag |
Sprache(n): | Englisch |
Tagung: | Footbridge 2022: Creating Experience, Madrid, Spain, 07-09 September 2022 |
Veröffentlicht in: | Footbridge Madrid 2022 - Creating Experience |
DOI: | 10.24904/footbridge2022.102 |
Abstrakt: |
The new bridge in the rearmost Ötztal is not a touristic attraction, it is a simple necessity as the existing route over the glacier had become more and more dangerous and complicated to walk. The new bridge with a span of 137.20 m stays at a height of around 82 m over the glacier stream of the Gurgler Ferner. Since its construction in spring 2017, the bridge serves as a new connection between the Ramolhaus and the Langtalereckhütte. The remoteness of the construction site, rapidly changing weather conditions at 2500 m above sea level and the adversity in accessibility due to the valley slopes, which were up to 80° steep, brought along high demands for design and construction of the bridge. |
Stichwörter: |
Spannbandbrücke Detailplanung
|
Lizenz: | Dieses Werk ist urheberrechtlich geschützt. Der/die Urheber erteilt durch die Veröffentlichung nur das Recht, dieses Werk zu betrachten/lesen und herunterzuladen. Eine weitere Vervielfältigung und Veröffentlichung bedarf der Genehmigung des Urhebers/der Urheber. |
Bauwerke und Projekte
0.54 MB Volltext herunterladen (PDF-Datei)
1.22 MB
- Über diese
Datenseite - Reference-ID
10632740 - Veröffentlicht am:
07.10.2021 - Geändert am:
08.10.2021