0
  • DE
  • EN
  • FR
  • Base de données et galerie internationale d'ouvrages d'art et du génie civil

Publicité

The " Piccard Bridge" in Obergurgl, Austria
Auteur(s): (tragwerk statt Ziviltechniker gmbh, Salzburg, Austria)
Médium: papier de conférence
Langue(s): anglais
Conférence: Footbridge 2022: Creating Experience, Madrid, Spain, 07-09 September 2022
Publié dans:
DOI: 10.24904/footbridge2022.102
Abstrait:

The new bridge in the rearmost Ötztal is not a touristic attraction, it is a simple necessity as the existing route over the glacier had become more and more dangerous and complicated to walk. The new bridge with a span of 137.20 m stays at a height of around 82 m over the glacier stream of the Gurgler Ferner. Since its construction in spring 2017, the bridge serves as a new connection between the Ramolhaus and the Langtalereckhütte. The remoteness of the construction site, rapidly changing weather conditions at 2500 m above sea level and the adversity in accessibility due to the valley slopes, which were up to 80° steep, brought along high demands for design and construction of the bridge.

Mots-clé:
pont caténaire
License:

Cette oeuvre est soumis au droits d'auteurs. Le(s) détenteur(s) des droits permet(tent) l'utilisation la visualistion et le téléchargement de cette oeuvre. La retransmission ou la publication nécessite la permission des détenteurs des droits.

Ouvrages et projets

Télécharger l'aperçu (fichier PDF)
0.54 MB
  • Informations
    sur cette fiche
  • Reference-ID
    10632740
  • Publié(e) le:
    07.10.2021
  • Modifié(e) le:
    08.10.2021
 
Structurae coopère avec
International Association for Bridge and Structural Engineering (IABSE)
e-mosty Magazine
e-BrIM Magazine