Abstract: |
Systra carried out the design of the replacement of the remaining 117 original stay cables on Penang Cable Stayed Bridge. This paper describes the design methodology for the replacement of stay cables and provides the key parameters for determining the schedule of stay cables final setting. |
||||
Keywords: |
concrete bridge cable structure assessment setting stay Sequence Penang criteria
|