Penang Bridge Stay Cable Replacement
|
Détails bibliographiques
Auteur(s): |
Huy Lam
Haythem Amami Arnaud Lemaire Mohamed Ketfi Serge Montens |
||||
---|---|---|---|---|---|
Médium: | papier de conférence | ||||
Langue(s): | anglais | ||||
Conférence: | 18th IABSE Congress: Innovative Infrastructures – Towards Human Urbanism, Seoul, Korea, 19-21 September 2012 | ||||
Publié dans: | IABSE Congress Seoul 2012 | ||||
|
|||||
Page(s): | 1536-1543 | ||||
Nombre total de pages (du PDF): | 8 | ||||
DOI: | 10.2749/222137912805112068 | ||||
Abstrait: |
Systra carried out the design of the replacement of the remaining 117 original stay cables on Penang Cable Stayed Bridge. This paper describes the design methodology for the replacement of stay cables and provides the key parameters for determining the schedule of stay cables final setting. |
||||
Mots-clé: |
béton pont câble structure
|