Penang Bridge Stay Cable Replacement
|
Bibliografische Angaben
Autor(en): |
Huy Lam
Haythem Amami Arnaud Lemaire Mohamed Ketfi Serge Montens |
||||
---|---|---|---|---|---|
Medium: | Tagungsbeitrag | ||||
Sprache(n): | Englisch | ||||
Tagung: | 18th IABSE Congress: Innovative Infrastructures – Towards Human Urbanism, Seoul, Korea, 19-21 September 2012 | ||||
Veröffentlicht in: | IABSE Congress Seoul 2012 | ||||
|
|||||
Seite(n): | 1536-1543 | ||||
Anzahl der Seiten (im PDF): | 8 | ||||
DOI: | 10.2749/222137912805112068 | ||||
Abstrakt: |
Systra carried out the design of the replacement of the remaining 117 original stay cables on Penang Cable Stayed Bridge. This paper describes the design methodology for the replacement of stay cables and provides the key parameters for determining the schedule of stay cables final setting. |
||||
Stichwörter: |
Beton Brücke Seil Tragwerk Bewertung
|