0
  • DE
  • EN
  • FR
  • International Database and Gallery of Structures

Advertisement

The Newly Structured Deployable Bridge with 48 Meter Span

Author(s):







Medium: conference paper
Language(s): English
Conference: 35th Annual Symposium of IABSE / 52nd Annual Symposium of IASS / 6th International Conference on Space Structures: Taller, Longer, Lighter - Meeting growing demand with limited resources, London, United Kingdom, September 2011
Published in:
Year: 2011
Abstract:

Luda PHILIPENKO

Head of Department ICSSEM/GTU

Tbilisi, Georgia

baka-@mail.ru

The existing variants of assaulting bridges, their general schemes, working principles and general tactical and technical parameters are determined.

For the first time in the world an assaulting, deployable bridge is offered with a 48 meter span, which with its dimension and weight, is similar to the existing 24 meter deployable bridge.

The mounting time of such type of a bridge should not exceed 7-10 minutes.

Keywords:
span truss strut track assaulting bridge bridgelayer girder upper boom lower boom
Structurae cannot make the full text of this publication available at this time.
  • About this
    data sheet
  • Reference-ID
    10065531
  • Published on:
    03/10/2011
  • Last updated on:
    05/07/2021
 
Structurae cooperates with
International Association for Bridge and Structural Engineering (IABSE)
e-mosty Magazine
e-BrIM Magazine