0
  • DE
  • EN
  • FR
  • Base de données et galerie internationale d'ouvrages d'art et du génie civil

Publicité

The Newly Structured Deployable Bridge with 48 Meter Span

Auteur(s):







Médium: papier de conférence
Langue(s): anglais
Conférence: 35th Annual Symposium of IABSE / 52nd Annual Symposium of IASS / 6th International Conference on Space Structures: Taller, Longer, Lighter - Meeting growing demand with limited resources, London, United Kingdom, September 2011
Publié dans:
Année: 2011
Abstrait:

Luda PHILIPENKO

Head of Department ICSSEM/GTU

Tbilisi, Georgia

baka-@mail.ru

The existing variants of assaulting bridges, their general schemes, working principles and general tactical and technical parameters are determined.

For the first time in the world an assaulting, deployable bridge is offered with a 48 meter span, which with its dimension and weight, is similar to the existing 24 meter deployable bridge.

The mounting time of such type of a bridge should not exceed 7-10 minutes.

Structurae ne peut pas vous offrir cette publication en texte intégral pour l'instant.
  • Informations
    sur cette fiche
  • Reference-ID
    10065531
  • Publié(e) le:
    03.10.2011
  • Modifié(e) le:
    05.07.2021
 
Structurae coopère avec
International Association for Bridge and Structural Engineering (IABSE)
e-mosty Magazine
e-BrIM Magazine