0
  • DE
  • EN
  • FR
  • Internationale Datenbank und Galerie für Ingenieurbauwerke

Anzeige

The Newly Structured Deployable Bridge with 48 Meter Span

Autor(en):







Medium: Tagungsbeitrag
Sprache(n): Englisch
Tagung: 35th Annual Symposium of IABSE / 52nd Annual Symposium of IASS / 6th International Conference on Space Structures: Taller, Longer, Lighter - Meeting growing demand with limited resources, London, United Kingdom, September 2011
Veröffentlicht in:
Jahr: 2011
Abstrakt:

Luda PHILIPENKO

Head of Department ICSSEM/GTU

Tbilisi, Georgia

baka-@mail.ru

The existing variants of assaulting bridges, their general schemes, working principles and general tactical and technical parameters are determined.

For the first time in the world an assaulting, deployable bridge is offered with a 48 meter span, which with its dimension and weight, is similar to the existing 24 meter deployable bridge.

The mounting time of such type of a bridge should not exceed 7-10 minutes.

Stichwörter:
Spannweite Fachwerkbinder Gleis
Structurae kann Ihnen derzeit diese Veröffentlichung nicht im Volltext zur Verfügung stellen.
  • Über diese
    Datenseite
  • Reference-ID
    10065531
  • Veröffentlicht am:
    03.10.2011
  • Geändert am:
    05.07.2021
 
Structurae kooperiert mit
International Association for Bridge and Structural Engineering (IABSE)
e-mosty Magazine
e-BrIM Magazine