More than a Footbridge - The new Baakenhafen Crossing
Complexity of Developing a Multi-Functional Structure in an Urban Context
Author(s): |
Thomas Müller
Thorsten Helbig Matthias Oppe Roman Schieber |
---|---|
Medium: | conference paper |
Language(s): | English |
Conference: | Footbridge 2017 Berlin - Tell A Story, 6-8.9.2017, Technische Universität Berlin (TU Berlin) |
Published in: | Footbridge 2017 Berlin - Tell A Story |
Year: | 2017 |
DOI: | 10.24904/footbridge2017.09427 |
Abstract: |
In 2013 Knippers Helbig won together with the architects from Gerkan, Marg and Partners (gmp) the competition for the new footbridge across the Baakenhafen in Hamburg. Now four years later the bridge has been completed in the heart of Hafencity. The process we are describing is an interdisciplinary design approach considering project specific goals which have been identified in the early design phase. These goals lead to the definition of project parameters which focus all members of the design team on the most important issues during the design process. Based on our bridge project across the Baakenhafen we describe the identification of its project parameters and the resulting static and structural responses. |
Keywords: |
steel footbridge trough bridge semi-integral multi-functional structure interdisciplinary design process human induced vibrations
|
License: | This creative work is copyrighted. The copyright holder(s) do(es) not grant any usage rights other than viewing and downloading the work for personal use. Further copying or publication requires the permission of the copyright holder(s). |
Structures and Projects
0.77 MB Download full text file (PDF)
0.53 MB
- About this
data sheet - Reference-ID
10075289 - Published on:
01/09/2017 - Last updated on:
05/06/2024