0
  • DE
  • EN
  • FR
  • Base de données et galerie internationale d'ouvrages d'art et du génie civil

Publicité

More than a Footbridge - The new Baakenhafen Crossing

Complexity of Developing a Multi-Functional Structure in an Urban Context

 More than a Footbridge - The new Baakenhafen Crossing
Auteur(s):



Médium: papier de conférence
Langue(s): anglais
Conférence: Footbridge 2017 Berlin - Tell A Story, 6-8.9.2017, Technische Universität Berlin (TU Berlin)
Publié dans:
Année: 2017
DOI: 10.24904/footbridge2017.09427
Abstrait:

In 2013 Knippers Helbig won together with the architects from Gerkan, Marg and Partners (gmp) the competition for the new footbridge across the Baakenhafen in Hamburg. Now four years later the bridge has been completed in the heart of Hafencity.

The process we are describing is an interdisciplinary design approach considering project specific goals which have been identified in the early design phase. These goals lead to the definition of project parameters which focus all members of the design team on the most important issues during the design process.

Based on our bridge project across the Baakenhafen we describe the identification of its project parameters and the resulting static and structural responses.

Mots-clé:
acier passerelle
License:

Cette oeuvre est soumis au droits d'auteurs. Le(s) détenteur(s) des droits permet(tent) l'utilisation la visualistion et le téléchargement de cette oeuvre. La retransmission ou la publication nécessite la permission des détenteurs des droits.

Ouvrages et projets

Télécharger l'aperçu (fichier PDF)
0.77 MB
  • Informations
    sur cette fiche
  • Reference-ID
    10075289
  • Publié(e) le:
    01.09.2017
  • Modifié(e) le:
    05.06.2024
 
Structurae coopère avec
International Association for Bridge and Structural Engineering (IABSE)
e-mosty Magazine
e-BrIM Magazine