Mersey Gateway Bridge (UK) - Design for Construction

 Mersey Gateway Bridge (UK) - Design for Construction
Author(s): , , , ,
Presented at IABSE Congress: Challenges in Design and Construction of an Innovative and Sustainable Built Environment, Stockholm, Sweden, 21-23 September 2016, published in , pp. 2275-2282
DOI: 10.2749/stockholm.2016.2266
Price: € 25.00 incl. VAT for PDF document  
ADD TO CART
Download preview file (PDF) 0.19 MB

The Mersey Gateway Bridge is being procured under a design, build, finance and operate contract, one of the largest of its type in the UK. Key aspects of the design and construction are described. ...
Read more

Bibliographic Details

Author(s): (Flint & Neill Ltd (COWI Group), London, UK)
(Flint & Neill Ltd (COWI Group), London, UK)
(Flint & Neill Ltd (COWI Group), London, UK)
(Flint & Neill Ltd (COWI Group), London, UK)
(Fhecor, Madrid, Spain)
Medium: conference paper
Language(s): English
Conference: IABSE Congress: Challenges in Design and Construction of an Innovative and Sustainable Built Environment, Stockholm, Sweden, 21-23 September 2016
Published in:
Page(s): 2275-2282 Total no. of pages: 8
Page(s): 2275-2282
Total no. of pages: 8
Year: 2016
DOI: 10.2749/stockholm.2016.2266
Abstract:

The Mersey Gateway Bridge is being procured under a design, build, finance and operate contract, one of the largest of its type in the UK. Key aspects of the design and construction are described. The crossing is 2.25km long and includes a 1km long three tower cable stayed bridge across the River Mersey estuary together with approach viaducts to the north and south. Main spans are 294m and 318m, approach viaduct spans are around 70m each. The deck features a single central plane of cables and a continuous single cell concrete box girder 4.6m deep with transverse post tensioned ribs at around 6m centers. Construction of the cable stayed bridge is based on the balanced cantilever principle and the approach viaducts are built using full span in-situ casting on a self-propelled moveable scaffold system.

Keywords:
construction methods post-tensioning cable stayed bridge moveable scaffold marine foundations

Structures and Projects