Key Construction Techniques of East Tower and Anchorage of Lingdingyang Bridge in Shenzhong Link

 Key Construction Techniques of East Tower and Anchorage of Lingdingyang Bridge in Shenzhong Link
Author(s): , ,
Presented at IABSE Congress: Bridges and Structures: Connection, Integration and Harmonisation, Nanjing, People's Republic of China, 21-23 September 2022, published in , pp. 2066-2067
DOI: 10.2749/nanjing.2022.2066
This publication is not currently available in full text.
Download preview file (PDF) 0.15 MB

Lingdingyang Bridge of Shenzhong Link is a three-span suspension bridge with a full floating system of 580 + 1666 + 580. In view of the complex construction conditions of the bridge site, the const...
Read more

Bibliographic Details

Author(s): (CCCC Second Harbour Engineering Co., Ltd., Wuhan 430040, China; Key Laboratory of Large-span Bridge Construction Technology, Wuhan 430040, China; CCCC Highway Bridge National Engineering Research Centre Co. Ltd, Beijing 100088, China.)
(CCCC Second Harbour Engineering Co., Ltd., Wuhan 430040, China; Key Laboratory of Large-span Bridge Construction Technology, Wuhan 430040, China; CCCC Highway Bridge National Engineering Research Centre Co. Ltd, Beijing 100088, China.)
(CCCC Second Harbour Engineering Co., Ltd., Wuhan 430040, China; Key Laboratory of Large-span Bridge Construction Technology, Wuhan 430040, China; CCCC Highway Bridge National Engineering Research Centre Co. Ltd, Beijing 100088, China.)
Medium: conference paper
Language(s): English
Conference: IABSE Congress: Bridges and Structures: Connection, Integration and Harmonisation, Nanjing, People's Republic of China, 21-23 September 2022
Published in:
Page(s): 2066-2067 Total no. of pages: 2
Page(s): 2066-2067
Total no. of pages: 2
DOI: 10.2749/nanjing.2022.2066
Abstract:

Lingdingyang Bridge of Shenzhong Link is a three-span suspension bridge with a full floating system of 580 + 1666 + 580. In view of the complex construction conditions of the bridge site, the construction scheme of island cofferdam was proposed for the east anchorage, and the flexible combined island cofferdam structure of ' lock steel pipe pile + I-shaped sheet pile + parallel steel wire rope ' was innovatively adopted to transform the offshore construction into land construction. For the east cable tower, the flexible manufacturing production line of steel mesh was developed, and the integrated intelligent tower building equipment suitable for ultra-high concrete cable tower was developed, forming the industrial construction technology of ultra-high cable tower based on reinforced bar product and intelligent tower building. The key construction technology of anchorage and tower solves the construction problem of super long-span suspension bridge in offshore sea, and improves the intelligent and industrial construction level of ultra-high tower engineering.

Keywords:
industrial construction suspension bridge sea anchorage island cofferdam ultra-high tower