Key Construction Techniques of East Tower and Anchorage of Lingdingyang Bridge in Shenzhong Link

 Key Construction Techniques of East Tower and Anchorage of Lingdingyang Bridge in Shenzhong Link
Autor(en): , ,
Beitrag für IABSE Congress: Bridges and Structures: Connection, Integration and Harmonisation, Nanjing, People's Republic of China, 21-23 September 2022, veröffentlicht in , S. 2066-2067
DOI: 10.2749/nanjing.2022.2066
Diese Veröffentlichung ist derzeit nicht als Volltext verfügbar.
Vorschau herunterladen (PDF-Datei) 0.15 MB

Lingdingyang Bridge of Shenzhong Link is a three-span suspension bridge with a full floating system of 580 + 1666 + 580. In view of the complex construction conditions of the bridge site, the const...
Weiterlesen

Bibliografische Angaben

Autor(en): (CCCC Second Harbour Engineering Co., Ltd., Wuhan 430040, China; Key Laboratory of Large-span Bridge Construction Technology, Wuhan 430040, China; CCCC Highway Bridge National Engineering Research Centre Co. Ltd, Beijing 100088, China.)
(CCCC Second Harbour Engineering Co., Ltd., Wuhan 430040, China; Key Laboratory of Large-span Bridge Construction Technology, Wuhan 430040, China; CCCC Highway Bridge National Engineering Research Centre Co. Ltd, Beijing 100088, China.)
(CCCC Second Harbour Engineering Co., Ltd., Wuhan 430040, China; Key Laboratory of Large-span Bridge Construction Technology, Wuhan 430040, China; CCCC Highway Bridge National Engineering Research Centre Co. Ltd, Beijing 100088, China.)
Medium: Tagungsbeitrag
Sprache(n): Englisch
Tagung: IABSE Congress: Bridges and Structures: Connection, Integration and Harmonisation, Nanjing, People's Republic of China, 21-23 September 2022
Veröffentlicht in:
Seite(n): 2066-2067 Anzahl der Seiten (im PDF): 2
Seite(n): 2066-2067
Anzahl der Seiten (im PDF): 2
DOI: 10.2749/nanjing.2022.2066
Abstrakt:

Lingdingyang Bridge of Shenzhong Link is a three-span suspension bridge with a full floating system of 580 + 1666 + 580. In view of the complex construction conditions of the bridge site, the construction scheme of island cofferdam was proposed for the east anchorage, and the flexible combined island cofferdam structure of ' lock steel pipe pile + I-shaped sheet pile + parallel steel wire rope ' was innovatively adopted to transform the offshore construction into land construction. For the east cable tower, the flexible manufacturing production line of steel mesh was developed, and the integrated intelligent tower building equipment suitable for ultra-high concrete cable tower was developed, forming the industrial construction technology of ultra-high cable tower based on reinforced bar product and intelligent tower building. The key construction technology of anchorage and tower solves the construction problem of super long-span suspension bridge in offshore sea, and improves the intelligent and industrial construction level of ultra-high tower engineering.

Stichwörter:
Industriebau Hängebrücke

Bauwerke und Projekte