0
  • DE
  • EN
  • FR
  • Base de données et galerie internationale d'ouvrages d'art et du génie civil

Publicité

Key Construction Techniques of East Tower and Anchorage of Lingdingyang Bridge in Shenzhong Link

 Key Construction Techniques of East Tower and Anchorage of Lingdingyang Bridge in Shenzhong Link
Auteur(s): , ,
Présenté pendant IABSE Congress: Bridges and Structures: Connection, Integration and Harmonisation, Nanjing, People's Republic of China, 21-23 September 2022, publié dans , pp. 2066-2067
DOI: 10.2749/nanjing.2022.2066
Cette publication n'est pas disponible en texte intégral pour l'instant.
Télécharger l'aperçu (fichier PDF) 0.15 MB

Lingdingyang Bridge of Shenzhong Link is a three-span suspension bridge with a full floating system of 580 + 1666 + 580. In view of the complex construction conditions of the bridge site, the const...
Lire plus

Détails bibliographiques

Auteur(s): (CCCC Second Harbour Engineering Co., Ltd., Wuhan 430040, China; Key Laboratory of Large-span Bridge Construction Technology, Wuhan 430040, China; CCCC Highway Bridge National Engineering Research Centre Co. Ltd, Beijing 100088, China.)
(CCCC Second Harbour Engineering Co., Ltd., Wuhan 430040, China; Key Laboratory of Large-span Bridge Construction Technology, Wuhan 430040, China; CCCC Highway Bridge National Engineering Research Centre Co. Ltd, Beijing 100088, China.)
(CCCC Second Harbour Engineering Co., Ltd., Wuhan 430040, China; Key Laboratory of Large-span Bridge Construction Technology, Wuhan 430040, China; CCCC Highway Bridge National Engineering Research Centre Co. Ltd, Beijing 100088, China.)
Médium: papier de conférence
Langue(s): anglais
Conférence: IABSE Congress: Bridges and Structures: Connection, Integration and Harmonisation, Nanjing, People's Republic of China, 21-23 September 2022
Publié dans:
Page(s): 2066-2067 Nombre total de pages (du PDF): 2
Page(s): 2066-2067
Nombre total de pages (du PDF): 2
DOI: 10.2749/nanjing.2022.2066
Abstrait:

Lingdingyang Bridge of Shenzhong Link is a three-span suspension bridge with a full floating system of 580 + 1666 + 580. In view of the complex construction conditions of the bridge site, the construction scheme of island cofferdam was proposed for the east anchorage, and the flexible combined island cofferdam structure of ' lock steel pipe pile + I-shaped sheet pile + parallel steel wire rope ' was innovatively adopted to transform the offshore construction into land construction. For the east cable tower, the flexible manufacturing production line of steel mesh was developed, and the integrated intelligent tower building equipment suitable for ultra-high concrete cable tower was developed, forming the industrial construction technology of ultra-high cable tower based on reinforced bar product and intelligent tower building. The key construction technology of anchorage and tower solves the construction problem of super long-span suspension bridge in offshore sea, and improves the intelligent and industrial construction level of ultra-high tower engineering.

Mots-clé:
pont suspendu

Ouvrages et projets