IZMIT Bay Suspension Bridge, Erection of Cable

 IZMIT Bay Suspension Bridge, Erection of Cable
Author(s): , , , ,
Presented at IABSE Conference: Elegance in structures, Nara, Japan, 13-15 May 2015, published in , pp. 146-147
DOI: 10.2749/222137815815774386
Price: € 25.00 incl. VAT for PDF document  
ADD TO CART
Download preview file (PDF) 0.54 MB

The construction of the Izmit Bay Suspension Bridge has started in January 2013 to be completed early 2016. The pre-fabricated parallel wire strands (PPWS) which consist of the main cable are pulle...
Read more

Bibliographic Details

Author(s):





Medium: conference paper
Language(s): English
Conference: IABSE Conference: Elegance in structures, Nara, Japan, 13-15 May 2015
Published in:
Page(s): 146-147 Total no. of pages: 8
Page(s): 146-147
Total no. of pages: 8
Year: 2015
DOI: 10.2749/222137815815774386
Abstract:

The construction of the Izmit Bay Suspension Bridge has started in January 2013 to be completed early 2016. The pre-fabricated parallel wire strands (PPWS) which consist of the main cable are pulled from the north anchorage to the south anchorage by looped hauling system on the catwalk and placed on cable saddles. The lower cable clamp connecting the hanger rope and upper cable clamp are delivered to the proper position by the carriage using the tramway system or main cable simultaneously and installed before deck construction to be started on the middle of June, 2015.

Keywords:
suspension bridge catwalk PPWS hauling system