0
  • DE
  • EN
  • FR
  • International Database and Gallery of Structures

Advertisement

Internal Unbonded Post-Tensioning in Direct Comparison to Internal Bonded Post-Tensioning by the Example of the Schallermuehle Viaduct

Author(s):


Medium: conference paper
Language(s): English
Conference: 35th Annual Symposium of IABSE / 52nd Annual Symposium of IASS / 6th International Conference on Space Structures: Taller, Longer, Lighter - Meeting growing demand with limited resources, London, United Kingdom, September 2011
Published in:
Year: 2011
Abstract:

This paper deals with a new prestressing concept for long, sectionally-erected prestressed concrete bridges with a T-beam cross section using internal unbonded longitudinal tendons. The new construction is contrasted with a structurally identical bridge using the customary internal bonded longitudinal tendons. Based on the new way of construction, the product quality, even of such long sectionally-erected bridges, can be increased considerably with additional costs of less than 2% of the total production costs.

Keywords:
viaduct concrete bridge robustness durability unbonded tendons unbonded post-tensioning

Structures and Projects

Structurae cannot make the full text of this publication available at this time.
  • About this
    data sheet
  • Reference-ID
    10065436
  • Published on:
    03/10/2011
  • Last updated on:
    05/07/2021
 
Structurae cooperates with
International Association for Bridge and Structural Engineering (IABSE)
e-mosty Magazine
e-BrIM Magazine