0
  • DE
  • EN
  • FR
  • Internationale Datenbank und Galerie für Ingenieurbauwerke

Anzeige

Internal Unbonded Post-Tensioning in Direct Comparison to Internal Bonded Post-Tensioning by the Example of the Schallermuehle Viaduct

Autor(en):


Medium: Tagungsbeitrag
Sprache(n): Englisch
Tagung: 35th Annual Symposium of IABSE / 52nd Annual Symposium of IASS / 6th International Conference on Space Structures: Taller, Longer, Lighter - Meeting growing demand with limited resources, London, United Kingdom, September 2011
Veröffentlicht in:
Jahr: 2011
Abstrakt:

This paper deals with a new prestressing concept for long, sectionally-erected prestressed concrete bridges with a T-beam cross section using internal unbonded longitudinal tendons. The new construction is contrasted with a structurally identical bridge using the customary internal bonded longitudinal tendons. Based on the new way of construction, the product quality, even of such long sectionally-erected bridges, can be increased considerably with additional costs of less than 2% of the total production costs.

Stichwörter:
Viadukt Beton Brücke Robustheit Dauerhaftigkeit

Bauwerke und Projekte

Structurae kann Ihnen derzeit diese Veröffentlichung nicht im Volltext zur Verfügung stellen.
  • Über diese
    Datenseite
  • Reference-ID
    10065436
  • Veröffentlicht am:
    03.10.2011
  • Geändert am:
    05.07.2021
 
Structurae kooperiert mit
International Association for Bridge and Structural Engineering (IABSE)
e-mosty Magazine
e-BrIM Magazine