Industrial Bridge, Chile

Challenge in seismic detail design

 Industrial Bridge, Chile
Author(s): , ,
Presented at IABSE Symposium: Long Span Bridges, Istanbul, Turkey, 26-28 April 2023, published in , pp. 887-895
DOI: 10.2749/istanbul.2023.0887
Price: € 25.00 incl. VAT for PDF document  
ADD TO CART
Download preview file (PDF) 0.55 MB

The Industrial Bridge above the Bio Bio river will become the largest road bridge with a transverse section of main beam and slab in Chile, with a length of 2.520 m in 56 spans, when it goes into s...
Read more

Bibliographic Details

Author(s): (JLS Ingeniería Ltda., Santiago, Chile)
(JLS Ingeniería Ltda., Santiago, Chile)
(Pontificia Universidad Católica de Valparaíso Valparaíso, Chile)
Medium: conference paper
Language(s): English
Conference: IABSE Symposium: Long Span Bridges, Istanbul, Turkey, 26-28 April 2023
Published in:
Page(s): 887-895 Total no. of pages: 9
Page(s): 887-895
Total no. of pages: 9
Year: 2023
DOI: 10.2749/istanbul.2023.0887
Abstract:

The Industrial Bridge above the Bio Bio river will become the largest road bridge with a transverse section of main beam and slab in Chile, with a length of 2.520 m in 56 spans, when it goes into service the year 2024. The conception and structural design was marked by the location and the reduce capacity of the soil (Soil type IV), due to flood events that are products of the widest river of Chile in one of the most seismic zone of the world. The present work shows the analysis made in the Industrial Bridge, where different studies were made to define the seismic parameters of the zone. This was made through a such as a deterministic and probabilistic for different conditions, which turned out as a result into a considerable increase of the seismic demand when compared to the demands of the Highway Manual code (Desgin code of Chile). For the final design, it was considered the used of and base isolator with energy dissipation, that was able to maintain the period of the bridge at 1.72 s but increased the damping 25% lowering the transfer of efforts from the superstructure to the infrastructure. The main elements of the structure ended up with an atypical characteristic for a beam bridge in Chile: prestressed girders of 45,00 m length and 2,50 m height and mechanical connectors for the longitudinal reinforcement, expansion joints with +/- 40 cm of transversal and longitudinal movement, and base isolator with energy dissipation bearings with a 25% of damping.

Keywords:
design bridge isolation seismic risk study