0
  • DE
  • EN
  • FR
  • Internationale Datenbank und Galerie für Ingenieurbauwerke

Anzeige

Industrial Bridge, Chile

Challenge in seismic detail design

 Industrial Bridge, Chile
Autor(en): , ,
Beitrag für IABSE Symposium: Long Span Bridges, Istanbul, Turkey, 26-28 April 2023, veröffentlicht in , S. 887-895
DOI: 10.2749/istanbul.2023.0887
Preis: € 25,00 inkl. MwSt. als PDF-Dokument  
ZUM EINKAUFSWAGEN HINZUFÜGEN
Vorschau herunterladen (PDF-Datei) 0.55 MB

The Industrial Bridge above the Bio Bio river will become the largest road bridge with a transverse section of main beam and slab in Chile, with a length of 2.520 m in 56 spans, when it goes into s...
Weiterlesen

Bibliografische Angaben

Autor(en): (JLS Ingeniería Ltda., Santiago, Chile)
(JLS Ingeniería Ltda., Santiago, Chile)
(Pontificia Universidad Católica de Valparaíso Valparaíso, Chile)
Medium: Tagungsbeitrag
Sprache(n): Englisch
Tagung: IABSE Symposium: Long Span Bridges, Istanbul, Turkey, 26-28 April 2023
Veröffentlicht in:
Seite(n): 887-895 Anzahl der Seiten (im PDF): 9
Seite(n): 887-895
Anzahl der Seiten (im PDF): 9
Jahr: 2023
DOI: 10.2749/istanbul.2023.0887
Abstrakt:

The Industrial Bridge above the Bio Bio river will become the largest road bridge with a transverse section of main beam and slab in Chile, with a length of 2.520 m in 56 spans, when it goes into service the year 2024. The conception and structural design was marked by the location and the reduce capacity of the soil (Soil type IV), due to flood events that are products of the widest river of Chile in one of the most seismic zone of the world. The present work shows the analysis made in the Industrial Bridge, where different studies were made to define the seismic parameters of the zone. This was made through a such as a deterministic and probabilistic for different conditions, which turned out as a result into a considerable increase of the seismic demand when compared to the demands of the Highway Manual code (Desgin code of Chile). For the final design, it was considered the used of and base isolator with energy dissipation, that was able to maintain the period of the bridge at 1.72 s but increased the damping 25% lowering the transfer of efforts from the superstructure to the infrastructure. The main elements of the structure ended up with an atypical characteristic for a beam bridge in Chile: prestressed girders of 45,00 m length and 2,50 m height and mechanical connectors for the longitudinal reinforcement, expansion joints with +/- 40 cm of transversal and longitudinal movement, and base isolator with energy dissipation bearings with a 25% of damping.

Stichwörter:
Entwurf Brücke

Bauwerke und Projekte