0
  • DE
  • EN
  • FR
  • International Database and Gallery of Structures

Advertisement

General Information

Name in local language: Puente Industrial
Completion: 2024
Status: under construction

Project Type

Location

Location: , , ,
Crosses:
  • Biobío River
Coordinates: 36° 48' 45.42" S    73° 7' 53.79" W
Show coordinates on a map

Technical Information

Dimensions

total length 2 250 m
span lengths 56 x 45 m
number of spans 56
abutments number 2
deck girder depth 2.25 m
number of longitudinal girders 7
piers number 55
piles diameter 2.50 m

Design Loads

design code(s) AASHTO LRFD 2012

Materials

piers reinforced concrete
piles reinforced concrete
deck slab reinforced concrete
abutments reinforced concrete
girders precast prestressed concrete

Participants

Relevant Web Sites

Relevant Publications

  • About this
    data sheet
  • Structure-ID
    20086725
  • Published on:
    01/09/2023
  • Last updated on:
    01/09/2023
Structurae cooperates with
International Association for Bridge and Structural Engineering (IABSE)
e-mosty Magazine
e-BrIM Magazine