General Information
Name in local language: | Puente Industrial |
---|---|
Completion: | 2024 |
Status: | under construction |
Project Type
Function / usage: |
Road bridge |
---|---|
Structure: |
Multiple T-section girder bridge |
Material: |
Prestressed concrete bridge |
Support conditions: |
Structurae Plus/Pro - Subscribe Now! |
Construction method: |
Precast girders with cast-in-situ slab |
Material: |
Structurae Plus/Pro - Subscribe Now! |
Location
Location: |
Concepción, Concepción, Biobío, Chile |
---|---|
Crosses: |
|
Coordinates: | 36° 48' 45.42" S 73° 7' 53.79" W |
Technical Information
Dimensions
total length | 2 250 m | |
span lengths | 56 x 45 m | |
number of spans | 56 | |
abutments | number | 2 |
deck | girder depth | 2.25 m |
number of longitudinal girders | 7 | |
piers | number | 55 |
piles | diameter | 2.50 m |
Design Loads
design code(s) | AASHTO LRFD 2012 |
Materials
piers |
reinforced concrete
|
---|---|
piles |
reinforced concrete
|
deck slab |
reinforced concrete
|
abutments |
reinforced concrete
|
girders |
precast prestressed concrete
|
Participants
Design
Relevant Web Sites
Relevant Publications
- (2023): Industrial Bridge, Chile. Challenge in seismic detail design. Presented at: IABSE Symposium: Long Span Bridges, Istanbul, Turkey, 26-28 April 2023, pp. 887-895.
- About this
data sheet - Structure-ID
20086725 - Published on:
01/09/2023 - Last updated on:
01/09/2023