0
  • DE
  • EN
  • FR
  • International Database and Gallery of Structures

Advertisement

Design of Two Pylon Cable Stayed Bridge in Busan-Geoje Fixed Link

 Design of Two Pylon Cable Stayed Bridge in Busan-Geoje Fixed Link
Author(s): , , , ,
Presented at IABSE Symposium: Sustainable Infrastructure - Environment Friendly, Safe and Resource Efficient, Bangkok, Thailand, 9-11 September 2009, published in , pp. 156-165
DOI: 10.2749/222137809796088332
Price: € 25.00 incl. VAT for PDF document  
ADD TO CART
Download preview file (PDF) 0.08 MB

Busan-Geoje Fixed Link was planed to link Geoje island to Gaduk island in Busan. There are two cable stayed bridges. Lot1 cable stayed bridge has 2x230m main spans and Lot2 cable stayed bridge has ...
Read more

Bibliographic Details

Author(s):





Medium: conference paper
Language(s): English
Conference: IABSE Symposium: Sustainable Infrastructure - Environment Friendly, Safe and Resource Efficient, Bangkok, Thailand, 9-11 September 2009
Published in:
Page(s): 156-165 Total no. of pages: 8
Page(s): 156-165
Total no. of pages: 8
Year: 2009
DOI: 10.2749/222137809796088332
Abstract:

Busan-Geoje Fixed Link was planed to link Geoje island to Gaduk island in Busan. There are two cable stayed bridges. Lot1 cable stayed bridge has 2x230m main spans and Lot2 cable stayed bridge has 475 main span. They have composite deck girders for superstructure, i.e. edge I-girder type. In this paper, the steel girder design and the details are described mainly regarding the Lot2 cable stayed bridge.

Keywords:
superstructure cable composite girder cable stayed bridge steel member Busan-Geoje Fixed Link

Structures and Projects