Design of Two Pylon Cable Stayed Bridge in Busan-Geoje Fixed Link
|
Bibliografische Angaben
Autor(en): |
Kyung-Sik Cho
Woo-Jong Kim Jae-Joong Lee Jae-Koo Lee Sang-Kyoon Jeong Se-Hoon Kim |
||||
---|---|---|---|---|---|
Medium: | Tagungsbeitrag | ||||
Sprache(n): | Englisch | ||||
Tagung: | IABSE Symposium: Sustainable Infrastructure - Environment Friendly, Safe and Resource Efficient, Bangkok, Thailand, 9-11 September 2009 | ||||
Veröffentlicht in: | IABSE Symposium Bangkok 2009 | ||||
|
|||||
Seite(n): | 156-165 | ||||
Anzahl der Seiten (im PDF): | 8 | ||||
Jahr: | 2009 | ||||
DOI: | 10.2749/222137809796088332 | ||||
Abstrakt: |
Busan-Geoje Fixed Link was planed to link Geoje island to Gaduk island in Busan. There are two cable stayed bridges. Lot1 cable stayed bridge has 2x230m main spans and Lot2 cable stayed bridge has 475 main span. They have composite deck girders for superstructure, i.e. edge I-girder type. In this paper, the steel girder design and the details are described mainly regarding the Lot2 cable stayed bridge. |
||||
Stichwörter: |
Überbau Seil
|