Design of the Cable-Stayed Bridge Signature Span of the New Champlain Bridge

 Design of the Cable-Stayed Bridge Signature Span of the New Champlain Bridge
Author(s): , , , ,
Presented at IABSE Symposium: Engineering the Future, Vancouver, Canada, 21-23 September 2017, published in , pp. 2075-2082
DOI: 10.2749/vancouver.2017.2075
Price: € 25.00 incl. VAT for PDF document  
ADD TO CART
Download preview file (PDF) 0.2 MB

The cable-stayed bridge for the New Champlain Bridge Project (the “Project”) is the signature crossing. The asymmetrical structure features a 124 m back span and a 240 m main span. The 170 m high s...
Read more

Bibliographic Details

Author(s): (T.Y. Lin International, San Francisco, CA, USA)
(T.Y. Lin International, San Francisco, CA, USA)
(T.Y. Lin International, San Francisco, CA, USA)
(T.Y. Lin International, San Francisco, CA, USA)
(T.Y. Lin International, San Francisco, CA, USA)
Medium: conference paper
Language(s): English
Conference: IABSE Symposium: Engineering the Future, Vancouver, Canada, 21-23 September 2017
Published in:
Page(s): 2075-2082 Total no. of pages: 8
Page(s): 2075-2082
Total no. of pages: 8
Year: 2017
DOI: 10.2749/vancouver.2017.2075
Abstract:

The cable-stayed bridge for the New Champlain Bridge Project (the “Project”) is the signature crossing. The asymmetrical structure features a 124 m back span and a 240 m main span. The 170 m high single-pylon consists of a tuning-fork configuration of twin masts. Inclined concrete tower legs and “W” shaped steel pier caps supporting the deck define the unique aesthetics of this bridge.

The focus of this paper is to provide a detailed description of the bridge including a discussion of the superstructure, main span tower, supporting piers and cable-stay system. It also describes the erection techniques used. Working alongside the Contractor, the design team made innovative use of pre-casting, modular segments, and non-traditional erection sequencing to meet the Project’s fast-track schedule of only 42 months, while overcoming the severe winters in Montréal.

Keywords:
bridge erection superstructure stay cables cable-stayed Champlain Pier caps main span tower pier bents

Structures and Projects