Design of the Cable-Stayed Bridge Signature Span of the New Champlain Bridge

 Design of the Cable-Stayed Bridge Signature Span of the New Champlain Bridge
Autor(en): , , , ,
Beitrag für IABSE Symposium: Engineering the Future, Vancouver, Canada, 21-23 September 2017, veröffentlicht in , S. 2075-2082
DOI: 10.2749/vancouver.2017.2075
Preis: € 25,00 inkl. MwSt. als PDF-Dokument  
ZUM EINKAUFSWAGEN HINZUFÜGEN
Vorschau herunterladen (PDF-Datei) 0.2 MB

The cable-stayed bridge for the New Champlain Bridge Project (the “Project”) is the signature crossing. The asymmetrical structure features a 124 m back span and a 240 m main span. The 170 m high s...
Weiterlesen

Bibliografische Angaben

Autor(en): (T.Y. Lin International, San Francisco, CA, USA)
(T.Y. Lin International, San Francisco, CA, USA)
(T.Y. Lin International, San Francisco, CA, USA)
(T.Y. Lin International, San Francisco, CA, USA)
(T.Y. Lin International, San Francisco, CA, USA)
Medium: Tagungsbeitrag
Sprache(n): Englisch
Tagung: IABSE Symposium: Engineering the Future, Vancouver, Canada, 21-23 September 2017
Veröffentlicht in:
Seite(n): 2075-2082 Anzahl der Seiten (im PDF): 8
Seite(n): 2075-2082
Anzahl der Seiten (im PDF): 8
Jahr: 2017
DOI: 10.2749/vancouver.2017.2075
Abstrakt:

The cable-stayed bridge for the New Champlain Bridge Project (the “Project”) is the signature crossing. The asymmetrical structure features a 124 m back span and a 240 m main span. The 170 m high single-pylon consists of a tuning-fork configuration of twin masts. Inclined concrete tower legs and “W” shaped steel pier caps supporting the deck define the unique aesthetics of this bridge.

The focus of this paper is to provide a detailed description of the bridge including a discussion of the superstructure, main span tower, supporting piers and cable-stay system. It also describes the erection techniques used. Working alongside the Contractor, the design team made innovative use of pre-casting, modular segments, and non-traditional erection sequencing to meet the Project’s fast-track schedule of only 42 months, while overcoming the severe winters in Montréal.