Design Features of Bardhaman Cable Stayed Road Over Bridge
|
Bibliographic Details
Author(s): |
Mike Schlaich
Subhasis Sen Soumya Ray Uwe Burkhardt |
||||
---|---|---|---|---|---|
Medium: | conference paper | ||||
Language(s): | English | ||||
Conference: | IABSE Symposium: Long Span Bridges and Roofs - Development, Design and Implementation, Kolkata, India, 24-27 September 2013 | ||||
Published in: | IABSE Symposium Kolkata 2013 | ||||
|
|||||
Page(s): | 1-7 | ||||
Total no. of pages: | 7 | ||||
Year: | 2013 | ||||
DOI: | 10.2749/222137812815776206 | ||||
Abstract: |
These paper is dealing with design of Cable stayed ROB at Bardhaman Railway yard. This 4 lane ROB will replace the existing 2 lane ROB across one of the busiest railway routes of the country. |
||||
Keywords: |
modal analysis aerodynamics construction stages cable stayed bridge
|