0
  • DE
  • EN
  • FR
  • International Database and Gallery of Structures

Advertisement

Design Features of Bardhaman Cable Stayed Road Over Bridge

 Design Features of Bardhaman Cable Stayed Road Over Bridge
Author(s): , , ,
Presented at IABSE Symposium: Long Span Bridges and Roofs - Development, Design and Implementation, Kolkata, India, 24-27 September 2013, published in , pp. 1-7
DOI: 10.2749/222137812815776206
Price: € 25.00 incl. VAT for PDF document  
ADD TO CART
Download preview file (PDF) 0.08 MB

These paper is dealing with design of Cable stayed ROB at Bardhaman Railway yard. This 4 lane ROB will replace the existing 2 lane ROB across one of the busiest railway routes of the country.

...

Read more

Bibliographic Details

Author(s):



Medium: conference paper
Language(s): English
Conference: IABSE Symposium: Long Span Bridges and Roofs - Development, Design and Implementation, Kolkata, India, 24-27 September 2013
Published in:
Page(s): 1-7 Total no. of pages: 7
Page(s): 1-7
Total no. of pages: 7
Year: 2013
DOI: 10.2749/222137812815776206
Abstract:

These paper is dealing with design of Cable stayed ROB at Bardhaman Railway yard. This 4 lane ROB will replace the existing 2 lane ROB across one of the busiest railway routes of the country.

Keywords:
modal analysis aerodynamics construction stages cable stayed bridge