Design Features of Bardhaman Cable Stayed Road Over Bridge
|
Détails bibliographiques
Auteur(s): |
Mike Schlaich
Subhasis Sen Soumya Ray Uwe Burkhardt |
||||
---|---|---|---|---|---|
Médium: | papier de conférence | ||||
Langue(s): | anglais | ||||
Conférence: | IABSE Symposium: Long Span Bridges and Roofs - Development, Design and Implementation, Kolkata, India, 24-27 September 2013 | ||||
Publié dans: | IABSE Symposium Kolkata 2013 | ||||
|
|||||
Page(s): | 1-7 | ||||
Nombre total de pages (du PDF): | 7 | ||||
Année: | 2013 | ||||
DOI: | 10.2749/222137812815776206 | ||||
Abstrait: |
These paper is dealing with design of Cable stayed ROB at Bardhaman Railway yard. This 4 lane ROB will replace the existing 2 lane ROB across one of the busiest railway routes of the country. |