Design Features of Bardhaman Cable Stayed Road Over Bridge
|
Bibliografische Angaben
Autor(en): |
Mike Schlaich
Subhasis Sen Soumya Ray Uwe Burkhardt |
||||
---|---|---|---|---|---|
Medium: | Tagungsbeitrag | ||||
Sprache(n): | Englisch | ||||
Tagung: | IABSE Symposium: Long Span Bridges and Roofs - Development, Design and Implementation, Kolkata, India, 24-27 September 2013 | ||||
Veröffentlicht in: | IABSE Symposium Kolkata 2013 | ||||
|
|||||
Seite(n): | 1-7 | ||||
Anzahl der Seiten (im PDF): | 7 | ||||
Jahr: | 2013 | ||||
DOI: | 10.2749/222137812815776206 | ||||
Abstrakt: |
These paper is dealing with design of Cable stayed ROB at Bardhaman Railway yard. This 4 lane ROB will replace the existing 2 lane ROB across one of the busiest railway routes of the country. |
||||
Stichwörter: |
Modalanalyse Aerodynamik Bauphasen
|