Design and Construction of Shinminato Bridge
|
Bibliographic Details
Author(s): |
Hiroshi Yoshinaga
Tetsuya Yamanouchi Yoshio Goto Masatsugu Nagai |
||||
---|---|---|---|---|---|
Medium: | conference paper | ||||
Language(s): | English | ||||
Conference: | IABSE Symposium: Improving Infrastructure Worldwide, Weimar, Germany, 19-21 September 2007 | ||||
Published in: | IABSE Symposium Weimar 2007 | ||||
|
|||||
Page(s): | 590-591 | ||||
Total no. of pages: | 8 | ||||
Year: | 2007 | ||||
DOI: | 10.2749/weimar.2007.0192 | ||||
Abstract: | This paper describes design and construction of Shinminato Bridge, a continuous steel-concrete hybrid bridge having a center span length of 360 meters. An outline of the bridge project, earthquake-resistant system against Level-2 earthquake with vertical shock having 7-grade magnitude, durability improvement design for attaining 100-year life span, and construction process are explained. | ||||
Keywords: |
cable-stayed bridge fatigue design level 2 earthquake vibration control system durability improvement wind-resistant design bicycle pedestrian way
|