Design and Construction of Shinminato Bridge
|
Bibliografische Angaben
Autor(en): |
Hiroshi Yoshinaga
Tetsuya Yamanouchi Yoshio Goto Masatsugu Nagai |
||||
---|---|---|---|---|---|
Medium: | Tagungsbeitrag | ||||
Sprache(n): | Englisch | ||||
Tagung: | IABSE Symposium: Improving Infrastructure Worldwide, Weimar, Germany, 19-21 September 2007 | ||||
Veröffentlicht in: | IABSE Symposium Weimar 2007 | ||||
|
|||||
Seite(n): | 590-591 | ||||
Anzahl der Seiten (im PDF): | 8 | ||||
Jahr: | 2007 | ||||
DOI: | 10.2749/weimar.2007.0192 | ||||
Abstrakt: | This paper describes design and construction of Shinminato Bridge, a continuous steel-concrete hybrid bridge having a center span length of 360 meters. An outline of the bridge project, earthquake-resistant system against Level-2 earthquake with vertical shock having 7-grade magnitude, durability improvement design for attaining 100-year life span, and construction process are explained. | ||||
Stichwörter: |
Schrägseilbrücke Ermüdungsbemessung
|