0
  • DE
  • EN
  • FR
  • International Database and Gallery of Structures

Advertisement

Bridge over the motorway A27, steel truss with a FRP deck

 Bridge over the motorway A27, steel truss with a FRP deck
Author(s): ,
Presented at IABSE Conference: Structural Engineering: Providing Solutions to Global Challenges, Geneva, Switzerland, September 2015, published in , pp. 1583-1590
DOI: 10.2749/222137815818358952
Price: € 25.00 incl. VAT for PDF document  
ADD TO CART
Download preview file (PDF) 0.08 MB

In the Netherlands a bridge is built crossing the motorway A27 near Utrecht. This bridge was constructed as a combination of steel and FRP, with a total length of 140 meters. The bridge is made of ...
Read more

Bibliographic Details

Author(s): (Movares, Utrecht, the Netherlands)
(Movares, Utrecht, the Netherlands)
Medium: conference paper
Language(s): English
Conference: IABSE Conference: Structural Engineering: Providing Solutions to Global Challenges, Geneva, Switzerland, September 2015
Published in:
Page(s): 1583-1590 Total no. of pages: 8
Page(s): 1583-1590
Total no. of pages: 8
Year: 2015
DOI: 10.2749/222137815818358952
Abstract:

In the Netherlands a bridge is built crossing the motorway A27 near Utrecht. This bridge was constructed as a combination of steel and FRP, with a total length of 140 meters. The bridge is made of a steel truss girder and a deck of FRP (composite).The connection of the composite deck to the steel truss girder was a challenging part. To solve this problem two load-paths are introduced. The first is made with an adhesive compound, the second with a pin-hole connection. Also the location of the bridge with the foundation inside a polder construction with highly compressible soil was a challenge to solve. The use of a jet grouting was necessary to solve this problem.

Keywords:
steel bridge composite FRP jet grouting hybrid FRP (Fiber reinforced polymer)

Structures and Projects